Custom Preloader Icon
0%

Gas transportation

We have a pipeline system through which we transport gas from various domestic production basins to other transporters and/or distributors.

We contribute to the expansion of the system with domestic gas from Vaca Muerta. To do this, we constructed gas pipelines in two key points of supply as they are the draft Reversal Pipeline North and the Pipeline Mercedes-Cardales.

The expansion of the transportation system, power to the current capabilities and options of new investment projects private, and also allow you to advance in the realization of the export of domestic gas.

3.184 Km

Operation and maintenance of 5 systems of Pipelines

46.800 Hp

3 compressor plants TRATAYÉN, SALIQUELLÓ AND MERCEDES

Pipeline Expert Pascasio Moreno (GPM)

To expand the transport capacity of domestic gas.

2023

Year

573

Kilometres

36"

Of pipe

26

m3/day

The Pipeline Perito Francisco Pascasio Moreno is a construction that allows it to transport natural gas from Vaca Muerta -the reservoir largest of Argentina - and to expand the transport capacity of domestic gas.

Trace backbone of the pipeline has an area of 573 kilometers between Tratayén (Neuquén) and Salliqueló, Buenos Aires, crossing the provinces of Río Negro and La Pampa with a pipe of 36 inches. This gas pipeline was put into operation by transporting initially a volume of 11 billion cubic meters of gas per day and then, next to the Compressor Plants -driving gas from Tratayén to Salliqueló-reached 21 million cubic meters per day.

However, this transportation capacity has been exceeded, reaching injection peaks of 26 MMm³/day. This gas pipeline allows for an increase in the gas transportation capacity from the Neuquén Basin and delivers it to consumption centers. In this way, Argentina is able to increase the availability of domestic gas for industries, businesses, and households.

Frame 204

Compressor stations

Kilometer 0 of the Pipeline Perito Francisco Pascacio Moreno, Tratayén, Neuquén.

1 motor-compressor of 15,900 HP power

Launched in July of 2024, sum of 5 million cubic meters of gas per day to the Pipeline Perito Moreno.

Ruta Provincial 85, km 65, Salliqueló, Buenos Aires.

1 motor-compressor of 15,900 HP power

Launched in July of 2024, sum of 5 million cubic meters of gas per day to the Pipeline Perito Moreno.

Reversal Pipeline North (RGN)

Replacing the import of gas from Bolivia.

2024

Year

122,8

Kilometres

36"

Of pipe

15

m3/day

It is a project that allows supplying the provinces of Córdoba, Tucumán, La Rioja, Catamarca, Santiago del Estero, Salta, and Jujuy with Argentine gas, replacing the gas imported from Bolivia. Although Vaca Muerta has a large availability of natural gas, there was no pipeline that allowed it to be transported to the Northern gas pipelines.

That is why they built the Pipeline of Federal Integration Tío Pujio-La Carlota, Cordoba province, with spouts of 36-inch diameter, which links the gas Pipeline Central-West with the North and has an extension 122.8 kilometers. That pipeline was put into service on November 4, 2024 along with the first 51 miles of loops between Tío Pujio and Ferreyra, with pipes of 30-inch diameter also in the province of Córdoba. Thus, the ability of a gas transportation system argentine rises, in a first stage, to 15 million cubic meters per day to cater to the provinces of Northern argentina.

The work also involves changing the direction of the gas flow ceases to be imported gas from NORTH to SOUTH to start getting gas from domestic production from SOUTH to NORTH. The transport capacity of the project Reversal of the Argentine North, you will reach 19 million cubic meters per day at the end of work conditioning in 4 compressor plants existing in the Pipeline North.

Frame 206

Compressor stations

Camino a Capilla de los Remedios Km 19, Capilla de los Remedios, Córdoba.

2 motocompresores de 3.060HP potencia.

6.120 HP

Ruta Nacional 60, Km 830, Deán Funes, Córdoba.

5 Motocompresores de 2.000 potencia y 1 turbina 7.700HP.

17.700 HP

Ruta Nacional 157 Km 1121, Lavalle, Santiago del Estero.

4 motocompresores 2,000 HP of power, 1 compressor 2.245 HP of power and 1 turbine 7.700 HP of power.

17.945 HP

Ruta Nacional 9/34, Km. 1496, Lumbrera, Salta.

5 motocompresores 2,000 HP of power, 1 compressor 2245HP power and 1 turbine 10.310 HP of power.

20.555 HP

Pipeline Mercedes Cardales

Replacing imported liquid fuels with gas from Vaca Muerta.

80

Kilometres

30"

Of pipe

15

m3/day

It is a product of high pressure of 30 inches in diameter and 80 kilometers of extension that allows you to transfer domestic gas from the backbone system of the South to the Northern system. The Pipeline Mercedes-Cardales, along with the Plant's Compressor Mercedes, carries up to 15 million cubic metres a day.

So, in the summer allows you to replace liquid fuels imported by domestic gas to generate electricity at the Thermal power Plants of Santa Fe and north of Buenos Aires. It also allows you to meet the residential demand. This is possible on the basis of the commissioning of the gas Pipeline Perito Moreno, its compressor plants and the expansion of the Loop of Ordoqui in the system of TGS.

Frame 199

Compressor station

Ruta Provincial 41, Mercedes, Buenos Aires.

1 motor compressor with a power of 15,000 HP.

Launched in December 2024, adds 6 million cubic meters of gas per day to the Pipeline Mercedes-Cardales

Gas pipeline from the north-east Argentina (GNEA)

With the potential to export domestic gas to neighbouring countries.

2014

Year

150

Locations

378.000

Users

The GNEA covers the area of the coastline and north-east argentina. If it crosses more than 150 locations, along its trace there is low demand for natural gas.

This pipeline backbone of 1.484 kilometers in length and 1.530 miles of leads that connect to it. Account with the possibility of re -starting of new projects of private investment - one of the conduits for export domestic gas to neighbouring countries.

Location

Santa Fe, Chaco, Formosa y Salta.

Extensión troncal

1.484 kilometers

Referrals

1.530 miles

Pipeline Integration Juana Azurduy (GIJA)

Exporting Argentine gas.

48

Kilometres

27

million m³/day

The GIJA is a duct that connects Argentina and Bolivia, and has an extension of about 48 kilometres, of which 35 are located in Argentina and the other in bolivia.

The duct has a transport capacity of up to 27 billion cubic meters of natural gas per day. This pipeline has the potential to be used to export gas to argentina to Brazil, through Bolivia.

Location

Campo Durán, Salta.

Menu